Triggers & thresholds

The numeric rules that drive autumn decision-making. The dashboard evaluates the GBW and GSM-R triggers automatically from the incident log.

GBW area trigger >2 in 7 days

  • More than 2 high-risk WSTCFs in 7 days in the same GBW area, attributed or likely leaf fall → special working at ALL high-risk sites in that area.
  • NOC issues the Leaf Fall Alert.
  • Exemptions where the area has no high-risk sites or all sites are RCM-monitored (NOC advised).
  • EM GBW areas: Bedford, Derby East, Derby West, EM Lincoln North, Boston, Allington, Swinderby East, Swinderby West, Gainsborough (+ Leicester). Swinderby East TCs are numbers, West are letters.

GSM-R acknowledged broadcast 2+ ROLAs / 3h

  • Trigger: 2 or more ROLAs at the same location within 3 hours.
  • Cell broadcast to trains in the area using the scripted safety message.

High-risk WSTCF site definition ≥2 / 3 yrs

  • 2 or more WSTCFs caused by contamination within 3 years (NR/L2/OPS/095).
  • EM used a 4-year window for 2025, giving 36 high-risk track circuits.
  • 48 high-risk sites in total held in NESA.

Low-adhesion high-risk site definition SPADs / overruns / veg

  • More than 2 SPADs in 3 years, OR
  • More than 4 station overruns in 3 years, OR
  • Score above 26 on NR/L2/OTK/5201/F3076 (vegetation), OR
  • Significant stakeholder concern.
  • 12 sites listed for 2025 (Appendix N).

30-minute rule (TW1 §28.2) Controlled test stop

  • A controlled test stop may be made when: the site has been inspected and nothing found; OR inspected and treated; OR a further 30 minutes have elapsed.
  • The test must be made by a vehicle of the same class as the one that reported.
  • Never approach a dead-end platform until the site has been treated.

Interflon 90-minute rule 90 min

  • Driver reports low adhesion within 90 minutes of an Interflon treatment → apply TW1 §28.2 and the 30-minute rule.
  • Interflon CleanRail: 1–2 minute activation, residual protection up to 25 days, never applied on points.
  • Schedule: Friday nights PBS3 Mansfield, SSJ1 Chellaston, PMJ Manton, NOB1 Newark; Sunday nights NOB3 Reepham/Cherry Willingham, GRS2 Sudbrook, SPD3 West Holmes/Slaughterhouse.

Missed-site definition Wire or not

  • RHTT fault, or access blocked by an infrastructure failure / unplanned possession → MISSED SITE: issue the missed-sites wire and arrange staff attendance even if later treated.
  • Pre-planned WON possession → NOT a missed site: no wire; staff inspect/treat high-risk junctions instead.

Cold weather −5°C

  • Below −5°C, contact the SCO before water jetting (RHTT jets at 1500 bar).
  • RHTT consist: top-and-tail locos, 2 flat wagons, water + adhesion modifier.

Season extension criteria 7 criteria

  • Seven criteria assessed, including: black/red adhesion days still occurring; less than 90% of leaves down; more than 12 ROLAs per line per week; adverse KPI trend.
  • Extension request to the SCO before the end of November; Operations Director approval required.

Early cessation criteria Mirror

  • More than 90% of leaves down;
  • 12 or fewer ROLAs per line per week;
  • No autumn KPIs in the preceding week.
  • Mirrors the extension criteria; Operations Director approval required.

TGA inspection cadence 7 / 14 days

  • 25 TGA sites; active by the second week of September, operational by 1 October.
  • Inspect 7 days after commissioning, then every 14 days.
  • Faults reported to Autumn Control (defective TGAs listed on wires and the log).

Railhead contamination levels L2 / L3

  • Level 2: running band barely visible, patchy black — treat unless no possibility of a blockage.
  • Level 3: thick continuous black, no running band visible — treatment essential.

Adhesion index scale (MetDesk, 0–10) 0–10

  • 0–2 Good · 3 Wet railhead / damp · 4–5 Moderate · 6–8 Poor · 9–10 Very poor.
  • Forecast issued daily by 03:00 (to 06:00 next day) with a 2–5 day outlook; black forecast → EWAT convened; red/black → Reg 3.5 reinstated at relevant sites.